Raised in parliament · Energy
VNI West
VNI West, an energy issue, has been raised in parliament in 200 speeches by 36 members from 9 parties between 7 March 2023 and 14 October 2026.
Debate over the planned VNI West transmission line through western and northern Victoria has run mostly in Victoria's parliament since 2024. Nationals and Liberal members, led by Walsh, Kealy and McArthur, raised its cost rising from $3 billion to between $7.6 and $11 billion, consultation with farmers, VicGrid's land access powers and fines, and called for existing easements to be used or the project stopped. Labor ministers said cancelling it would raise household bills and put investment at risk as coal plants close. The Greens supported publicly owned renewable energy.
What was said
Each speech summarised by AI from Hansard, the official record. Quotes are checked word for word against it.
Electricity infrastructure
Bev McArthur, Liberal
McArthur said the Western Renewables Link and VNI West have blown out in cost and rest on flawed analysis and a conflicted AEMO. She asked that VicGrid independently review the Victoria University 'plan B'.
“The action I seek, Minister, is for you to allow VicGrid to undertake a genuinely independent review of the plan B analysis”
Energy policy
David Limbrick, Libertarian Party
Limbrick said the GenCost report treats grid integration spending as sunk costs, so wind and solar look cheaper than they are. He listed Snowy 2.0, the Western Renewables Link and VNI West, and asked for nuclear modelling and full-cost modelling.
“It is easy to claim that renewables are cheap if you pretend that the money spent on integrating them is free.”
Mallee Electorate: Energy
Anne Webster, Nationals
Webster said a Victoria Energy Policy Centre report proposes an alternative plan B for the VNI West transmission line that would cost less. She argued that the project's costs will be passed on to consumers and raised questions about CSIRO GenCost data.
“The difference in annual electricity bill costs between the VEPC's plan B and the extended VNI West is a whopping $940 million by 2036.”
Electricity infrastructure
Gaelle Broad, Nationals
Broad said regional residents are concerned about VNI West, which she said is expected to cost $3.25 billion. She listed landholder, land value, agricultural and tourism costs, and raised the gas ban and power price rises.
“Victorians are already paying record energy bills.”
Energy Legislation Amendment (Energy Safety) Bill 2023: Second reading
Jade Benham, Nationals
Benham said the Nationals support the bill but raised community concerns about the VNI West transmission route, citing a submission by Bruce Mountain and Simon Bartlett. She called for proper consultation by companies.
“We are broadly in support of this bill, but the compliance element also needs to extend to those companies to make sure that they are consulting with communities in the proper way.”
Mental Health and Wellbeing Amendment Bill 2023: Second reading
Gaelle Broad, Nationals
Broad said she is concerned the bill shifts focus from a health-led response and supports omitting clauses 13 and 14. She linked mental health to floods, cost of living, lockdowns, VNI West, native timber closure and the Commonwealth Games cancellation.
“Clearly, it is far better to have health professionals trained in mental health first aid as first responders.”
Rural and Regional Affairs and Transport References Committee: Reference
Perin Davey, Nationals
Davey supported the inquiry and described landholder concerns about the HumeLink and VNI West transmission projects. She raised the option 5(a) route, a 70-metre easement, agricultural impacts, and plains-wanderer habitat near Deniliquin.
“This is what we want to explore in this inquiry. We want to hear more of these stories.”
Energy Prices
Anne Webster, Nationals
Webster said power prices are rising and objected to the VNI West transmission proposal through Mallee farmland. She also criticised the safeguard mechanism and said nuclear energy should not have been banned.
“The VNI West transmission proposal is an example from my own electorate.”
Productivity Commission Amendment (Electricity Reporting) Bill 2023: Second Reading
David Van, Independent
Van said the bill would bring transparency and accountability on energy prices. He criticised the VNI West transmission project and its cost increases, and argued the government's $275 power bill promise was broken.
“Transparency, accountability and better outcomes for Australians are what Senator Duniam's private senator's bill promises to deliver.”
Environment and Communications References Committee: Reference
Perin Davey, Nationals
Davey argued regional Queenslanders object to powerlines through Borumba national park, and cited the HumeLink review. She referred to a report critical of the VNI West line and said the inquiry would allow affected people to be heard and explore other options.
“I commend this inquiry to the Senate.”
Regional Australia: Infrastructure
Chris Bowen, Labor
Bowen said AEMO changed the VNI West route after community feedback, that Murray River councils supported the project, and quoted the previous energy minister's support for it.
“The new Option 5A pivots away from its original path, heading north-west instead of through Charlton and the broad irrigation district, to skirt around Kerang and hit the Murray River downstream of Barmah.”
Northern Victoria Region
Gaelle Broad, Nationals
Broad said she supports renewables but that regional communities carry the burden of the preferred VNI West route, option 5A. She said public engagement has been poor and asked about consultation and compensation for landowners.
“I ask: where is the minister, where is the public consultation, and where are the details about compensation to be paid to the landowners, neighbours and communities impacted by these transmission lines?”
Western Victoria Region
Bev McArthur, Liberal
McArthur said AEMO's economic modelling for the interconnector relies on questionable assumptions, cited critics calling it a monumental mistake, and asked the minister to join her in meeting affected communities.
“It piles questionable assumption upon questionable assumption, some even contradicting current Victorian government policy in order to justify the cost.”
Western Victoria Region
Joe McCracken, Liberal
McCracken asked when details of AEMO's preferred option 5A would be released and whether the minister would meet affected locals, citing landholder payments of $8000 per kilometre.
“Will the minister actually meet with the people who are impacted by her decisions, because they feel that they have been absolutely forgotten?”
Energy Legislation Amendment (Electricity Outage Emergency Response and Other Matters) Bill 2023: Second reading
Bev McArthur, Liberal
McArthur criticised the truncated scrutiny of the bill. She argued for undergrounding distribution lines and criticised the VNI West transmission route.
“Rushed legislation is bad legislation.”
Energy Legislation Amendment (Electricity Outage Emergency Response and Other Matters) Bill 2023: Second reading
Bev McArthur, Liberal
McArthur said transmission lines are cutting through environmental areas and farms, and called for a holistic approach to generation, transmission and distribution. She said she will not oppose the bill.
“You will never get any transmission if you do not actually get social licence, just by way of a bit of advice.”
Mallee Electorate: Energy
Anne Webster, Nationals
Webster said farmers in the Mallee are worried about the VNI West transmission line, describing 80-metre towers across farmland. She criticised AEMO's consultation, said AEMO did not attend some community meetings, and called on Labor to listen to regional communities.
“Labor must learn that regional communities are not their dumping ground.”
Electricity infrastructure
Joe McCracken, Liberal
McCracken described a St Arnaud rally against option 5 and listed concerns on consultation, land valuations, compulsory acquisition and farmland. He said no government representative attended.
“I also call on the government to go back to the drawing board with VNI option 5.”
Electricity infrastructure
Bev McArthur, Liberal
McArthur said AEMO's VNI West report removes the need for a North Ballarat terminal station, so the Western Renewables Link route should be reassessed. She asked for a multicriteria review and statewide reassessment of renewables generation.
Electricity infrastructure
Gaelle Broad, Nationals
Broad said a late-added 'option 5' route for VNI West towards St Arnaud and Pyramid Hill has had minimal consultation, with submissions closing on 5 April. She asked the minister to extend consultation and hold face-to-face meetings.
“Again I ask that the minister guarantee she will extend the public consultation period and set up a proper consultation process with the affected communities on this very important issue.”
Source: Hansard, the Parliament of Victoria's and the Parliament of Australia's. The issue names, summaries and overview are written by AI (Claude) and can be wrong; every speech links to the record, which is the authority.