A step closer to bringing back the Porter Pascoe footbridge! π I joined Mayor Mark Irwin to reveal the concept designs for the replacement bridge at Lake Gwelup. Itβs fantastic to see my $1.5 million election commitment taking shape through our partnership with the City of Stirling. The new steel footbridge will restore an important connection between Gwelup and Karrinyup for pedestrians and cyclists, with improved links to existing shared paths, a design that considers fire protections and minimise impacts on the surrounding natural environment. The new footbridge is expected to be constructed in 2027! Thank you to the Gwelup community and Friends of Lake Gwelup for your advocacy, support and patience. I know how much this bridge means to locals, and I look forward to seeing it back where it belongs.
MP, Western Australia
Stuart Aubrey
Stuart Aubrey, member for Scarborough, Labor
Paid for by Stuart Aubrey MLA
- Spent
- $200β$299
- Times shown
- 15Kβ20K
- Running since
- 9 Nov 2026
Still running.
What the ad says
A step closer to bringing back the Porter Pascoe footbridge! π I joined Mayor Mark Irwin to reveal the concept designs for the replacement bridge at Lake Gwelup. Itβs fantastic to see my $1.5 million election commitment taking shape through our partnership with the City of Stirling. The new steel footbridge will restore an important connection between Gwelup and Karrinyup for pedestrians and cyclists, with improved links to existing shared paths, a design that considers fire protections and minimise impacts on the surrounding natural environment. The new footbridge is expected to be constructed in 2027! Thank you to the Gwelup community and Friends of Lake Gwelup for your advocacy, support and patience. I know how much this bridge means to locals, and I look forward to seeing it back where it belongs.
See it in Meta's Ad Library
- Started 9 Nov 2026$200β$299, running