28 November 2024 · Question time · Transport and infrastructure
Evelyn electorate
Vallence asked the Water minister when Melbourne Water will introduce quarterly maintenance of the Lilydale open drain.
What was said
Summarised by AI from the official record. Quotes are checked word for word against it.
Bridget Vallence, Liberal
Vallence asked when Melbourne Water will introduce quarterly clearing and de-silting of the Lilydale open drain, saying annual maintenance is not enough and the drain is blocked and flooding homes.
“when will Melbourne Water introduce a quarterly maintenance schedule to ensure regular clearing and de-silting of the entire Lilydale open drain from Nimblefoot Way near Saintly Place to Nelson Road?”
Other debates on this
- Evelyn electorate · Victorian Legislative Assembly, 23 March 2023
- Evelyn electorate · Victorian Legislative Assembly, 31 August 2023
- Evelyn electorate · Victorian Legislative Assembly, 5 October 2023
- Evelyn electorate · Victorian Legislative Assembly, 15 November 2023
- Evelyn electorate · Victorian Legislative Assembly, 29 November 2023
- Evelyn electorate · Victorian Legislative Assembly, 6 February 2024
- Evelyn electorate · Victorian Legislative Assembly, 22 February 2024
- Evelyn electorate · Victorian Legislative Assembly, 7 March 2024
- Evelyn electorate · Victorian Legislative Assembly, 19 March 2024
- Evelyn electorate · Victorian Legislative Assembly, 30 April 2024
- Evelyn electorate · Victorian Legislative Assembly, 28 May 2024
- Evelyn electorate · Victorian Legislative Assembly, 20 June 2024
Source: Parliament of Victoria Hansard, Parliament of Victoria. Summaries and stances are written by AI (Claude) from the record and can be wrong; the record is the authority. We quote at most a sentence or two and link to the full text.