17 November 2023 · Question time · Transport and infrastructure
Queensland: Emu Swamp Dam and Pipeline
Roberts asked why the government is no longer proceeding with the Emu Swamp dam and pipeline near Stanthorpe. Watt said the project lacked a feasibility and business case, and listed Queensland water and road projects. Roberts said the cancelled project would have created jobs and that Stanthorpe residents need water.
What the 6 speakers said
Summarised by AI from the official record. Quotes are checked word for word against it.
Malcolm Roberts, One Nation
Roberts asked why the government is no longer proceeding with the Emu Swamp dam and pipeline near Stanthorpe.
“Minister, why is the Australian government no longer proceeding with construction of the Emu Swamp dam and pipeline located near Stanthorpe in our state of Queensland?”
Murray Watt, Labor
Watt said the Emu Swamp dam was a promise by the former coalition without funding or proper planning. He said funding was redirected to projects including the Rockhampton Ring Road, with an extra $348 million.
“That dam was a promise that was made by the former coalition government that never had the funding, wasn't properly planned and is not proceeding.”
Malcolm Roberts, One Nation
Roberts said the government cancelled the Emu Swamp dam, which would have created 700 jobs, and asked why the Albanese government is hollowing out the bush.
“Your government cancelled the Emu Swamp dam. This water infrastructure would have created 700 jobs, 250 jobs during construction.”
Murray Watt, Labor
Watt rejected the premise of the question and said some projects cannot proceed due to lack of funding or business case, while funding other regional projects such as the Rockhampton Ring Road and Charters Towers industrial precinct access.
Malcolm Roberts, One Nation
Roberts said Stanthorpe needed water tankers during the drought and that the Emu Swamp dam was a modest 24 gigalitre proposal now being axed. He asked what residents would drink.
“What are the growing number of residents in the area going to drink?”
Murray Watt, Labor
Watt said the Emu Swamp dam project lacked a feasibility and business case, and that the government is funding water projects including the Paradise Dam, Cairns water security and Darwin water supply.
“As I've already explained, Senator Roberts, unfortunately for the good people of the Southern Downs, the Emu Swamp dam project and pipeline didn't have a proper feasibility case and didn't have a proper business case.”
Source: Parliament of Australia Hansard, Parliament of Australia. Summaries and stances are written by AI (Claude) from the record and can be wrong; the record is the authority. We quote at most a sentence or two and link to the full text.