Raised in parliament · Transport and infrastructure
West Gate Tunnel
West Gate Tunnel, a transport and infrastructure issue, has been raised in parliament in 203 speeches by 60 members from 11 parties between 23 November 2022 and 23 September 2026.
The West Gate Tunnel, a Melbourne toll road built with Transurban that opened in late 2025, was debated in Victoria's parliament. Labor members said it would take about 9000 trucks a day off inner west streets, backed by 24-hour truck bans, and said the opposition had opposed it. Liberal members, led by Davis, cited cost increases, the Transurban toll deal and CFMEU conduct, and proposed a toll cap. The Greens, Legalise Cannabis and Family First members called for filters on the ventilation stacks and raised air quality.
What was said
Each speech summarised by AI from Hansard, the official record. Quotes are checked word for word against it.
Footscray electorate truck curfews
Katie Hall, Labor
Hall said residents remain concerned about truck volumes on Williamstown and Millers roads despite the West Gate Tunnel and no-truck cameras. She asked for curfews to address safety, noise and pollutants.
“However, residents remain concerned about the volume of truck movements that will continue along Williamstown and Millers roads.”
West Gate Tunnel
Moira Deeming, Family First
Deeming said the virtual tunnel experience omits that the project is three years late and $3.5 billion over budget. She also listed B-double clearance, toxic soil and diesel fumes, and said resources go to the Suburban Rail Loop.
“There is no mention that the project is three years late and $3.5 billion over budget and that the clearance is too low for most of the B-doubles it was meant to divert.”
Wage Theft Amendment Bill 2025: Second reading
Bridget Vallence, Liberal
Vallence said the CFMEU had been found to have breached workplace laws more than 1500 times. She said a complaints referral function is a weak response and the opposition's construction enforcement Victoria would have investigative powers.
“Rather than setting up an independent body that will have proper investigative and enforcement powers to penalise unlawful conduct, like the Victorian Liberals and Nationals have proposed with our construction enforcement Victoria policy, all Labor wants to do is refer the complaints somewhere else.”
Wage Theft Amendment Bill 2025: Second reading
Rachel Westaway, Liberal
Westaway said the bill does little about CFMEU conduct and project cost blowouts, and called for construction enforcement Victoria. She said Prahran's small businesses face compliance burdens under wage theft laws.
“What is missing is not another referral pathway, it is political will to use existing powers against the CFMEU.”
Local Jobs First Amendment Bill 2025: Second reading
John Lister, Labor
Lister supported the bill, listing the commissioner's new site inspection power, the deprioritisation scheme and the 10 per cent apprentice labour hours. He cited west Melbourne Big Build projects and falling western suburbs unemployment.
“This is not a blacklist. It aims to disincentivise noncompliance with our development plans and provides agencies with information on poor past performance on Local Jobs First applicable projects.”
Local Jobs First Amendment Bill 2025: Second reading
Rachel Westaway, Liberal
Westaway opposed the bill, citing the Auditor-General's report on $11.66 billion in major project cost increases, the West Gate Tunnel, and civil penalties of up to $101,000. She urged support for the member for Kew's amendments.
“We cannot support legislation that expands bureaucratic powers and imposes new penalties when the government promoting it demonstrates such spectacular incompetence in managing public money and delivering projects”
Appropriation (2025–2026) Bill 2025: Second reading
Jaclyn Symes, Labor
Symes said infrastructure spending will come down and defended Metro Tunnel, West Gate Tunnel and Footscray Hospital as productive infrastructure, while acknowledging it has contributed to debt.
“Has it contributed to debt? Yes, it has, but productive infrastructure is something that responsible governments should invest in.”
Roads and Ports Legislation Amendment (Road Safety and Other Matters) Bill 2025: Second reading
Katie Hall, Labor
Hall supported the bill, describing the extension of hit-and-run time limits, camera infringements issued by police employees and additional blood sample collectors. She raised truck bans and enforcement cameras in the inner west.
“What amounts to administrative protocols should not offer an easy out for people who get behind the wheel while they are intoxicated.”
West Gate Tunnel
Katie Hall, Labor
Hall said the West Gate Tunnel's ventilation design was approved by EPA scientists, and that residents should be heard. She asked the minister to join her in meeting the Maribyrnong Truck Action Group.
“I strongly believe that everyone has the right to be heard and to present their ideas directly to decision-makers.”
Government performance
Sarah Connolly, Labor
Connolly opposed the motion, saying borrowing built the West Gate Tunnel, Metro Tunnel and Footscray Hospital and that the opposition talks down Victoria.
“We borrowed to build.”
Ministers statements: transport infrastructure
Jacinta Allan, Labor
Allan said three tunnel projects are under construction, listed the Metro Tunnel, West Gate Tunnel and North East Link, and said the member for Bulleen had opposed all three.
“These are tunnelling projects that some said would never get off the drawing board. Well, they are not just off the drawing board, they are in the ground.”
Financial Management Legislation Amendment Bill 2025: Second reading
Tim McCurdy, Nationals
McCurdy called the bill financial mismanagement legislation and listed blowouts on the West Gate Tunnel, North East Link and Suburban Rail Loop. He said the bill reduces oversight and election-period reporting and raised debt and the credit rating.
“Victoria wants the truth and Victoria deserves the truth, and this bill will not deliver the truth.”
Transport infrastructure
Sarah Connolly, Labor
Connolly said the Coalition has opposed the Metro Tunnel, West Gate Tunnel, level crossing removals and Suburban Rail Loop. She listed western roads projects and Sunshine station superhub funding.
“It has always been said here in this place that the Victorian Liberal Party have never met any infrastructure project they liked.”
Ministers statements: State Electricity Commission
Gabrielle Williams, Labor
Williams said 2025 is a year of switching on the Metro Tunnel, West Gate Tunnel and the SEC powering public transport.
“2025 is a year of switching on.”
Air pollution
Katherine Copsey, Greens
Copsey said communities near the West Gate Tunnel and North East Link want filtration on air stacks and air monitoring before opening, and said the EPA has no powers to enforce compliance.
“Filtration is proven technology, it is readily available and it should be fitted from day one, just as the government’s own inquiry recommended in 2017.”
Western Metropolitan Region
Trung Luu, Liberal
Luu asked if the government uses low-carbon concrete on Big Build sites, citing a constituent's concern and the West Gate project.
“Can the minister please update my constituents on if the government is using environmentally friendly concrete options such as low-carbon concrete mix on their building worksites?”
Cost of living
Nina Taylor, Labor
Taylor opposed the motion and said the opposition blocks housing. She described the housing statement, activity centres and school investment in her electorate.
“It is not about saying one or the other and it is not about being snobby or looking down on people who live in apartment blocks. It is about choice.”
Ministers statements: transport infrastructure
Gabrielle Williams, Labor
Williams listed the Metro Tunnel, West Gate Tunnel and level crossing removals, and federal funding for airport rail, Suburban Rail Loop and outer suburban roads.
“They have invested $7 billion into airport rail, they have invested $2.2 billion in the Suburban Rail Loop and they have invested $1.2 billion in outer suburban roads”
West Gate Tunnel
Brad Battin, Liberal
Battin said the West Gate Tunnel will blow out by $1 billion, cited a CFMEU fine of $168,000 and asked how much of the blowout came from union activity.
“Labor's West Gate Tunnel is set to blow out by another $1 billion.”
West Gate Tunnel
Jacinta Allan, Labor
Allan said Battin was incorrect about the project's cost and that Labor is delivering it with construction partners.
West Gate Tunnel
Jacinta Allan, Labor
Allan said the project is on track and that the opposition previously opposed it.
West Gate Tunnel
Jacinta Allan, Labor
Allan said the tunnel offers an alternative to the West Gate Bridge and recalled the Liberal Party opposing the project in the Legislative Council.
West Gate Tunnel
Jacinta Allan, Labor
Allan said the project is being delivered consistent with the 2021 agreement with Transurban and its subcontractors.
“The project is being delivered consistent with the agreement that was reached with Transurban and its subcontractors in 2021.”
West Gate Tunnel
Brad Battin, Liberal
Battin asked whether the Premier will commission an audit of money taken from the West Gate Tunnel by bikies and organised crime.
West Gate Tunnel
Melissa Horne, Labor
Horne listed changes she asked for, including signal changes, a temporary pedestrian crossing on Blackshaws Road and a lower speed limit. She said permanent truck bans will apply once the project is complete.
“I have asked the department to also establish a temporary pedestrian crossing on Blackshaws Road to make sure that pedestrians, particularly families with young children, can cross safely.”
West Gate Tunnel
David Davis, Liberal
Davis said the West Gate Tunnel grew from a $500 million slip-road to well past $10 billion. He said tolls rise every six months and add to cost-of-living pressures.
“They are already paying in their tolls, and their tolls go up every six months to pay more, specially to fund the West Gate Tunnel.”
Economic policy
Jacinta Allan, Labor
Allan said capital investment supports jobs and pointed to the Metro Tunnel, West Gate Tunnel and Footscray Hospital opening later this year.
“behind every single one of those projects is a worker and their family.”
West Gate Tunnel
David Ettershank, Legalise Cannabis
Ettershank said western suburbs residents face high air pollution and truck emissions will rise with the tunnel. He asked that Transurban get no licence until filtration is installed.
“The action I seek is for the minister to guarantee that no operating licence will be granted to Transurban until air filtration has been fitted to the West Gate Tunnel ventilation stacks.”
Western Metropolitan Region
David Ettershank, Legalise Cannabis
Ettershank said respiratory hospital admissions for young people in Maribyrnong are 171 per cent above the national average and asked for filters on the tunnel stacks.
“will the minister act to protect the health of kids in Yarraville, Newport, Williamstown and surrounding suburbs by installing filters on the tunnel vent stacks?”
Victorian Bank Levy (Tax the Major Banks) Bill 2025: Introduction
Dylan Wight, Labor
Wight said bank levies are a federal matter and said the policy was previously put forward by the former member for Prahran. He said Greens oppose projects such as the West Gate Tunnel.
Source: Hansard, the Parliament of Victoria's and the Parliament of Australia's. The issue names, summaries and overview are written by AI (Claude) and can be wrong; every speech links to the record, which is the authority.