Raised in parliament · Transport and infrastructure
North-South Corridor
North-South Corridor, a transport and infrastructure issue, has been raised in parliament in 18 speeches by 10 members from 2 parties between 7 November 2022 and 5 February 2026.
Who raised it most
Members who spoke about it, most speeches first.
| Member | Party | Speeches |
|---|---|---|
| James Stevens | Liberal | 3 |
| Louise Miller-Frost | Labor | 3 |
| Tony Pasin | Liberal | 3 |
| Amanda Rishworth | Labor | 2 |
| Steve Georganas | Labor | 2 |
| Anne Ruston | Liberal | 1 |
| Karen Grogan | Labor | 1 |
| Catherine King | Labor | 1 |
| Murray Watt | Labor | 1 |
| Rowan Ramsey | Liberal | 1 |
Places it came up with
- Adelaide9
- Boothby5
- South Australia3
- Sturt2
- Grey2
- Glenelg2
- Western Australia
- Truro
- Trott Park
- Torrens
- Southern suburbs of Adelaide
- Sheidow Park
Raised alongside
What was said
Each speech summarised by AI from Hansard, the official record. Quotes are checked word for word against it.
Boothby Electorate: Infrastructure
Louise Miller-Frost, Labor
Miller-Frost said the three Glenelg tram overpasses are open, removing three level crossings, delivered by federal and state Labor governments. She also listed related southern Adelaide road projects.
“The tram overpasses eliminate three level crossings.”
Labor Government
Amanda Rishworth, Labor
Rishworth cited the Majors Road interchange, the North South Corridor, 10 newly bulk-billing practices, Morphett Vale Urgent Care Clinic funding and Revive Live funding for a festival.
“Delivering this project took a Labor state government and a Labor federal government.”
Address-in-Reply
Louise Miller-Frost, Labor
Miller-Frost listed Labor's record on Medicare, NDIS, school funding, fee-free TAFE, surpluses and inflation. She described Boothby projects including Flinders Medical Centre, the North-South Corridor and the Adelaide freight bypass, and the housing investment.
“Only a Labor government will protect Medicare and the NDIS.”
Hall, Mr Raymond Steele
Rowan Ramsey, Liberal
Ramsey recounted Hall's career, including electoral reform, opposition to the Chowilla Dam and the Metropolitan Adelaide transport study. He said Hall's legacy included the Festival Centre site.
“That's a man who was prepared to sacrifice power on a matter of principle and fairness.”
South Australia: Roads
Amanda Rishworth, Labor
Rishworth described the $15.4 billion Torrens to Darlington project, the Majors Road on-off ramp for southern suburbs, projected jobs, and 22 local road projects funded under Road to Recovery and the Special Local Roads Program.
Boothby Electorate: Roads
Louise Miller-Frost, Labor
Miller-Frost said the tender for the Torrens to Darlington stage of the North-South Corridor went to a John Holland Group consortium. She listed the project's features, including three tunnel-boring machines, six kilometres of tunnels and completion in 2031.
“This is a huge project in South Australia, due for completion in 2031.”
Adelaide Electorate: Infrastructure
Steve Georganas, Labor
Georganas welcomed the selection of the John Holland-led consortium for Torrens to Darlington, saying it would bring forward completion with three tunnel-boring machines. Georganas also said the Thebby Theatre and Queen of Angels church would be protected, and listed travel time and jobs benefits.
“The milestone is that there's a preferred alliance partner being selected for the nation-shaping project.”
Appropriation Bill (No. 1) 2024-2025, Appropriation Bill (No. 2) 2024-2025, Appropriation (Parliamentary Departments) Bill (No. 1) 2024-2025: Second Reading
Steve Georganas, Labor
Georganas supported the budget, highlighting tax cuts, housing investment, bulk-billing, urgent care clinics, and HECS relief. He listed North-South Corridor works, the Marion Road intersection, and the Cross Road-Marion Road tram crossing in Adelaide.
“And of course there is the largest investment ever, by any government, in housing.”
Infrastructure
Karen Grogan, Labor
Grogan said the review was needed after Liberal-National mismanagement, that no projects in Grey were dropped, and listed roads including the Augusta Highway duplication and Port Augusta to Perth corridor upgrade as proceeding.
“I would like to reassure the people in my duty electorate of Grey that nothing has been dropped.”
Mayo Electorate: Infrastructure
Catherine King, Labor
King said the infrastructure pipeline had $33 billion in known cost pressures and that the government would guarantee the $120 billion pipeline. She cited $2.7 billion in South Australia for the North-South Corridor.
“We will continue to work with states and territories for priority infrastructure projects, but what we have done today is guarantee the $120 billion infrastructure investment pipeline.”
Infrastructure
Murray Watt, Labor
Watt said the review will end waste and rorts and fund over 400 projects, listing additional funding for the north-south corridor in Adelaide, Logan and Gold Coast faster rail, the M1 Pacific Motorway extension, and METRONET.
Infrastructure
Tony Pasin, Liberal
Pasin argued the 90-day infrastructure review has run past its timeline, holding up the $120 billion pipeline. He raised rising road toll figures and the Truro bypass, which he said was threatened by the review.
“Let's get on with it; let's stop the delay.”
Infrastructure: Roads
James Stevens, Liberal
Stevens called for heavy freight to be moved off Portrush Road and the Truro Bypass to be resumed. He opposed any diversion onto Cross Road and said the Liberal Party backs rerouting freight around Monarto.
“I am committed to getting those dangerous heavy trucks out of the suburbs of Sturt.”
Rural and Regional Australia: Infrastructure
Anne Ruston, Liberal
Ruston criticised the government's treatment of regional Australia and said $1.3 billion of South Australian infrastructure has been cut or delayed. She named the north-south corridor, Hahndorf township and Truro bypass.
“We've got a raft of broken promises, we've got a country unnecessarily divided over the Voice and absolutely everybody is worse off.”
Infrastructure Australia Amendment (Independent Review) Bill 2023: Second Reading
James Stevens, Liberal
Stevens spoke against the bill, raising concerns about the 90-day review of the $120 billion pipeline and its effect on South Australian projects, including the North-South Corridor. He said the opposition will support a second reading amendment.
“With those comments, we have an excellent amendment to this second reading, which we will support.”
South Australia: Floods
Tony Pasin, Liberal
Pasin described about 1,200 kilometres of damaged roads and property impacts. He asked the state government to fund long-term flood-proofing of Bookpurnong Road and Kingston Road and the duplication of the Sturt Highway, and called for better emergency coordination.
“I want to see Bookpurnong Road raised, to floodproof it for the future.”
Appropriation Bill (No. 1) 2022-2023: Consideration in Detail
Tony Pasin, Liberal
Pasin criticised cuts to South Australian black spot funding and the delay to North-South Corridor funding, and asked about the heavy vehicle productivity commitment and trucking panel.
“Why have you taken the axe to $1.1 million from the forward estimates for black spot funding in South Australia?”
INFRASTRUCTURE FUNDING
James Stevens, Liberal
Stevens said South Australia had no new infrastructure announcements in the budget and criticised delays to the north-south corridor. He argued this would hurt infrastructure jobs and the state economy.
“Unfortunately from Adelaide's point of view, we didn't have any new announcements in investment.”
Source: Hansard, the Parliament of Victoria's and the Parliament of Australia's. The issue names, summaries and overview are written by AI (Claude) and can be wrong; every speech links to the record, which is the authority.