Raised in parliament · Transport and infrastructure
North East Link
North East Link, a transport and infrastructure issue, has been raised in parliament in 264 speeches by 60 members from 9 parties between 20 December 2022 and 19 November 2026.
Mostly in Victoria's parliament, Labor members, including Premier Allan, described the North East Link tunnel and Eastern Freeway upgrades as cutting congestion and taking trucks off local roads, with completion due in 2028. Liberal members raised the cost rising to over $26 billion, non-disclosure agreements, noise walls, lost open space and alleged underworld-linked contractors on the project. The Greens, led by Puglielli, raised dust, a chemical spill into Banyule Creek, unfiltered ventilation stacks and loss of wildlife habitat.
What was said
Each speech summarised by AI from Hansard, the official record. Quotes are checked word for word against it.
Construction, Forestry and Maritime Employees Union
Keith Wolahan, Liberal
Wolahan defended the MPI, comparing CFMEU practices on projects and linking them to the North East Link and Suburban Rail Loop cost estimates in his electorate. He argued the issue was about power rather than principle.
“when you come to Victoria and see that the cost of the North East Link in my electorate has gone from $10 billion to $26 billion, you can see that they have succeeded, at the expense of taxpayers.”
Powerful owl
Nick McGowan, Liberal
McGowan described a night spent searching for powerful owls with Victorian National Parks Association staff and said he is concerned about habitat loss from the North East Link. He asked for assurances on works done along the corridor and invited the minister to visit.
“what I am seeking from the minister in addition is an assurance that some or any works have been done in respect to the whole corridor that is affected by the North East Link Program.”
Ministers statements: transport infrastructure
Danny Pearson, Labor
Pearson said 84 level crossings have been removed and listed the Metro Tunnel, West Gate Tunnel, North East Link and Suburban Rail Loop. He said opposition opposition to the Suburban Rail Loop puts 4000 jobs at risk.
“If you are against the SRL, you are against jobs. You are going to put 4000 Victorian workers on the scrap heap at the next election.”
Government Construction Projects Integrity Bill 2024: Second reading
Melina Bath, Nationals
Bath supported the bill, saying CFMEU-linked crime contributes to $40 billion in cost blowouts on projects including North East Link and West Gate Tunnel, and that regional roads miss out.
“It is time to take the gloves off and confront the thuggery and criminal activity on taxpayer-funded worksites.”
Future Made in Australia Bill 2024, Future Made in Australia (Omnibus Amendments No. 1) Bill 2024: Second Reading
Keith Wolahan, Liberal
Wolahan opposed the bill, arguing it reflects government picking winners and that government spending is driving inflation. He cited the Intergenerational report, the Productivity Commission chair's comments, and the Fratelli Engineering business in Victoria and the North East Link costs.
“Government should be there to help private sector companies like Fratelli Engineering.”
North East Link
Matthew Guy, Liberal
Guy said residents of St Andrews Crescent and Claremont Lane report cracked homes and noise from the North East Link, and said the government is out of money.
“the North East Link is now telling people that they cannot fix their problems because the Labor government is out of money.”
North East Link
Matthew Guy, Liberal
Guy cited residents' figures from the environment effects statement on PM2.5, nitrogen dioxide and night noise. He asked what action will protect people at local schools and sporting grounds and why NSW and WHO noise guidance is not followed.
“The North East Link is, let us just say to be polite, highly unresponsive, despite claims otherwise, to residents in my area.”
Construction, Forestry and Maritime Employees Union
Jacinta Allan, Labor
Allan said the government is delivering a transport infrastructure pipeline including level crossing removals, the West Gate Tunnel, the North East Link and the Metro Tunnel.
“Whether it is in regional Victoria with road and rail, in the suburbs removing level crossings or building the West Gate Tunnel, the North East Link or the Metro Tunnel, we are getting on and delivering our significant pipeline of transport infrastructure projects.”
Construction, Forestry and Maritime Employees Union
Bridget Vallence, Liberal
Vallence said the CFMEU engaged in unlawful conduct on state projects, citing North East Link, Metro and West Gate Tunnel and $40 billion in cost overruns. She said the Liberals would set up a building industry watchdog.
“The Victorian Liberals will establish a new watchdog to enforce fair standards of conduct under a new code of practice for Victoria’s building industry.”
Construction, Forestry and Maritime Employees Union
Jess Wilson, Liberal
Wilson sought leave for a motion on a $10 billion cost blowout and delays on the North East Link, which she attributed to CFMEU conduct.
“overseeing a $10 billion cost blowout and years-long delays on the North East Link”
Environment and Planning Committee: Reference
Sonja Terpstra, Labor
Terpstra said the government supports the motion and listed consultation examples: the women's pain inquiry, North East Link, the mental health royal commission and anti-vilification laws. She said consultation does not mean the government must change its view.
“Consultation does not mean that if you disagree with the government, you get your way.”
Government Construction Projects Integrity Bill 2024: Introduction
Bridget Vallence, Liberal
Vallence said the Premier should support the bill, and that not doing so allows intimidation to continue on sites such as the West Gate Tunnel and North East Link. She called the government's review inadequate.
“If she and the Labor government do not support this bill and have debate right now, then Premier Allan is effectively giving a green light to bikie gangs and convicted criminals”
Fair Work (Registered Organisations) Amendment (Withdrawal from Amalgamation) Bill 2024: Second Reading
Keith Wolahan, Liberal
Wolahan argued that construction costs in Melbourne were high and linked this to the CFMEU and North East Link and Suburban Rail Loop costs. He said the bill was a piecemeal amendment and that demerger rights should apply across the board.
“That's not how we should do legislation in this place. It shouldn't be driven by the power, circumstances or particular factions that might have numbers that'll influence something.”
North East Link
Matthew Guy, Liberal
Guy said traders and residents report dust in homes and air-conditioning units from the North East Link and that the Authority has not accepted responsibility. He called for support for those affected during construction.
“the North East Link needs to take responsibility for their actions and support those businesses and those residents who are being adversely affected during construction.”
Budget papers 2024–25
Tim McCurdy, Nationals
McCurdy argued Labor cannot manage money or major projects, citing state debt, project blowouts, taxes, roads, hospital mergers, youth crime and regional neglect.
Budget papers 2024–25
Anthony Carbines, Labor
Carbines listed Ivanhoe school, Austin Hospital emergency department, level crossing and North East Link investments, police funding and racing industry programs.
“There has been $4.5 billion in investment from our government in Victoria Police.”
Koonung Creek Reserve
Katherine Copsey, Greens
Copsey said North East Link will occupy 60 per cent of Koonung Creek Reserve during construction and permanently remove 25 per cent. She asked for delivery of the master plan, including mature tree planting.
“The action I seek tonight is for the minister to direct the North East Link Program to deliver the community’s vision for the reinstatement of the Koonung Creek Reserve as captured in the Koonung Creek Reserve master plan.”
Northern Metropolitan Region
Evan Mulholland, Liberal
Mulholland said residents of Epping North and Wollert feel forgotten and that the government prioritises the Suburban Rail Loop over their rail extension. He criticised North East Link blowouts and a proposed busway.
“My question is for the Minister for Public and Active Transport, and it is: when will the government finally commit to Wollert rail?”
Transport infrastructure
Jacinta Allan, Labor
Allan listed major projects including North East Link, 76 level crossing removals and Metro Tunnel, saying the opposition had not supported them.
“We can talk about the North East Link, which is going to support 8000 jobs.”
Suburban Rail Loop
Katherine Copsey, Greens
Copsey said Victoria lacks a published integrated transport plan. She saw merit in the SRL concept but raised questions about platform lengths, interchange distances and planning powers, and criticised the West Gate Tunnel and North East Link.
“All of these issues come back to the fact that Victoria has no published integrated transport plan, as required by legislation.”
North East Link
Jackson Taylor, Labor
Taylor said North East Link works are underway, adding 45 kilometres of new lanes and twin tunnels to complete the ring road.
“We are adding 45 kilometres of new lanes and new twin tunnels, which will finally complete the missing link, creating the ring road.”
Appropriation (2024–2025) Bill 2024: Second reading
Richard Welch, Liberal
Welch noted the federal budget gave $3.3 billion to North East Link and nothing for the Suburban Rail Loop, and asked whether SRL East still needs an additional $11.5 billion from the Commonwealth.
“The 2024–25 federal budget provided $3.3 billion for the North East Link but not a dollar for the Suburban Rail Loop (SRL).”
Appropriation (2024–2025) Bill 2024: Second reading
Jaclyn Symes, Labor
Symes welcomed the North East Link contribution and said Victoria's infrastructure share is improving. She said the question sought an opinion.
Appropriation (2024–2025) Bill 2024: Second reading
Jaclyn Symes, Labor
Symes said she welcomes more federal investment in Victoria and that the North East Link contribution shows improvement.
Appropriation (2024–2025) Bill 2024: Second reading
Evan Mulholland, Liberal
Mulholland asked how the government can forecast peak infrastructure investment of $24.0 billion without funding for Arden, North East Link and the Suburban Rail Loop.
Budget papers 2024–25: Second reading
Evan Mulholland, Liberal
Mulholland cited anonymous Labor sources on the budget, said school upgrades were delayed and listed cost blowouts on North East Link, West Gate Tunnel and Metro Tunnel. He raised the outer metropolitan ring road and the Beveridge freight terminal.
“We have got North East Link promised at $5 billion, the valuation at $18 billion, current budget at $26.2 billion. That is $21.2 billion blowout.”
Budget papers 2024–25: Second reading
Sonja Terpstra, Labor
Terpstra said the budget supports families, listing the $400 school saving bonus, Glasses for Kids, school building funds, North East Link, the Suburban Rail Loop, social housing at Lusher Road, Croydon, and the Big Housing Build.
“Of course what is at the heart of this budget – and this is something that the Allan Labor government fundamentally understands – is that we are about helping families.”
North-Eastern Metropolitan Region
Aiv Puglielli, Greens
Pugliielli described mycorrhizal networks and asked for evidence the North East Link considered its impact on them at Koonung Creek wetlands.
“Can you provide any evidence of having considered the project’s impact on the mycorrhizal network currently being destroyed at the Koonung Creek wetlands?”
Transport infrastructure projects
Richard Welch, Liberal
Welch said the government has presided over $40.4 billion in project cost overruns, citing North East Link, West Gate Tunnel and Metro Tunnel. He asked the Treasurer what steps were taken to understand the blowouts and prevent them.
“These cost overruns mean reduced public services.”
North-Eastern Metropolitan Region
Richard Welch, Liberal
Welch said the federal government allocated $3.25 billion to North East Link but not to Suburban Rail Loop East, leaving a shortfall above $20 billion. He asked the Treasurer to assure that the precinct will not be expanded in size, height or population.
“Last night confirmed the absence of federal support for the Suburban Rail Loop East in my electorate, despite the Victorian government’s request for an additional $10 billion.”
Source: Hansard, the Parliament of Victoria's and the Parliament of Australia's. The issue names, summaries and overview are written by AI (Claude) and can be wrong; every speech links to the record, which is the authority.