Raised in parliament · Transport and infrastructure
Metro Tunnel big switch
Metro Tunnel big switch, a transport and infrastructure issue, has been raised in parliament in 3 speeches by 3 members from 2 parties between 3 December 2025 and 12 August 2026.
Who raised it most
Members who spoke about it, most speeches first.
| Member | Party | Speeches |
|---|---|---|
| Gary Maas | Labor | 1 |
| Rachel Westaway | Liberal | 1 |
| Sarah Connolly | Labor | 1 |
Places it came up with
- Williams Landing
- Toorak
- South Yarra
- Prahran
- Narre Warren South
- Laverton
- Hawksburn
- Caulfield
- Armadale
- Aircraft
Raised alongside
What was said
Each speech summarised by AI from Hansard, the official record. Quotes are checked word for word against it.
Laverton electorate
Sarah Connolly, Labor
Connolly said more than 180 extra weekly services start 23 August and asked how the upgrades will benefit Laverton residents on the Wyndham Vale and Werribee lines.
“how will these timetable upgrades benefit communities in my electorate of Laverton who use the Wyndham Vale and Werribee lines?”
Narre Warren South electorate
Gary Maas, Labor
Maas asked how the Metro Tunnel timetable switch will benefit his electorate, noting the Pakenham and Cranbourne lines.
“Minister, how will the Metro Tunnel’s big switch benefit constituents in my electorate of Narre Warren South?”
Metro Tunnel
Rachel Westaway, Liberal
Westaway said the 1 February 2026 timetable change forces transfers for Prahran commuters and crowds the Frankston line. She said the timetable is not yet released and density is rising while connectivity falls.
“You do not open a railway without telling passengers where the train is going.”
Source: Hansard, the Parliament of Victoria's and the Parliament of Australia's. The issue names, summaries and overview are written by AI (Claude) and can be wrong; every speech links to the record, which is the authority.